One Call Lincoln Concrete

Concrete floor installation in Lincoln CA - a slab ready for what goes on top

Got a cracked, uneven slab, or a new room that needs a floor? We pour a level concrete floor planned around what goes on top of it.

Request an estimate
Broad concrete pool deck with curved steps leading into a swimming pool beside a brick house.

What does it take to put in a concrete floor in Lincoln?

Concrete floor installation in Lincoln means forming, pouring and finishing a new slab for a room, a shop or an outdoor space. Done right, it gives you a flat, solid floor that's ready for whatever goes on top of it.

Most people call us because they're adding a room, finishing out a space or replacing a slab that's cracked, sinking or uneven, and the first thing they ask about is price. The number moves with the size of the floor, whether it's inside or out, what flooring goes on top, how much digging and base work the ground needs and whether you want a plain or decorative finish. The schedule usually turns on the permit check, the weather on pour day and, for an indoor floor, how long the slab needs to dry before flooring goes down. When I come out, I walk the job with you, explain what I see and put it all in writing, and if the floor is going in your garage, our garage floor concrete page covers that version of the job.

How we handle concrete floor installation

The first thing I ask is whether the floor is inside or out and what's going on top of it, because that changes how we handle moisture coming up from below. Then our crew digs out to firm ground and packs a gravel base over the subgrade, the soil the slab sits on, since a floor is only as flat as what's under it. We set the forms, lay a vapor retarder sheet for an indoor floor, and set rebar, the steel grid inside the slab, up off the ground where it can hold things together. We pour, finish the surface to suit the space, cut control joints, which are shallow grooves that give the slab a planned place to crack, and keep it covered and damp while it cures, the wait while concrete gains strength. Up front, I'll also tell you that a few hairline cracks are normal and how we keep them tight, and if the budget needs trimming, I'll cut the finish before the base, the same way a kitchen can get by with a plain plate but never with skipped prep.

A new floor often brings work around it. When the slab sits higher than the yard or a doorway, we can form concrete steps in the same job so the new level meets the ground cleanly, and a slab that's going outside next to water is really a job for concrete pool decks, which need a surface and slope built for wet feet.

  • Indoor floor with flooring on top

    This suits an addition, a converted space or any room where tile, wood or carpet is going down. We plan the moisture protection from the start, because fixing it after the flooring's in means tearing the flooring out.

  • Bare indoor floor for a shop

    This suits a workshop, storage room or utility space where the concrete itself is the finished floor. We give it a smooth, hard troweled surface that sweeps clean and stands up to carts and tools.

  • Outdoor slab on the ground

    This suits a pad for a shed, a hot tub or an outdoor work area. We give it a broom finish, light ridges dragged across the top for grip when it's wet, and slope it so water runs away from the house.

Concrete floor installation in Lincoln: permits and clay ground

Lincoln requires a building permit whenever a structure is built or altered, and the city's list of work that doesn't need one names floor coverings and some concrete patios but not concrete floors, so whether your floor needs a permit has to be checked before anyone digs. Before we start, we check with the city or county office that covers your address, which in Lincoln is the city's Building Division, and when a permit is needed, we take care of the paperwork and inspections with you. Work the city exempts from permits still has to meet HOA rules, city zoning and grading requirements, so it's worth checking those early too.

The ground is the bigger local factor. The low western part of Placer County, from Rocklin to the county line, has a lot of high-clay soil that swells when it's wet and shrinks as it dries, and over time that movement can damage foundations. Lincoln sits in that part of the county, so we dig out soft dirt, build a packed base and watch where water goes around the slab, because wet clay under one corner is how a floor ends up uneven. We run into the same ground on jobs in Rocklin and Roseville. The city's design criteria put Lincoln in Seismic Design Category D, an earthquake design level, with no frost line or snow load, so the clay, not cold weather, is what we plan a slab around.

Get a written estimate for your concrete floor

Tell us the floor's size in square feet, whether it's inside or out and what flooring you plan to put on top, and we'll reply within one business day to set a time for me to come out. The estimate is free, done on site and comes with no obligation, and after I walk the job with you, I'll put everything in writing. You can also email sales@lincolncaconcrete.com.

(916) 884-6595

Concrete floor questions from Lincoln homeowners

How much does a concrete floor cost in Lincoln, CA?

A concrete slab in the Sacramento area usually costs about $7 to $14 per square foot. Reinforced slabs run a little more per square foot than unreinforced pads, and staining or stamping isn't included in that range. Your own number depends on size, base work and moisture protection, and I'll put it in writing after I see the site.

Does an indoor concrete floor need a vapor barrier?

Yes, industry guidance calls a vapor retarder, a sheet that slows water vapor coming up from the ground, sensible under every interior floor slab. Outdoor slabs on the ground generally go without one, which is why I ask first whether your floor is inside or out. It's industry guidance, not a Lincoln code requirement, and it's one reason an indoor floor is planned and priced differently from an outdoor slab.

Will my new concrete floor crack?

Most likely you'll see a few hairline cracks, because some random cracking should be expected in any slab, even with closely spaced control joints. Steel won't stop cracks from forming, but when it's sized and placed right, it keeps them tightly closed. That's why I bring it up before the pour instead of after.

Can I pour my own concrete floor in Lincoln?

Yes, Lincoln lets property owners do the work on their own residence, with few exceptions. If you hire someone, the city expects that contractor to carry a current City of Lincoln business license, current workers' compensation and a bond, and the state's Contractors State License Board has a concrete classification that covers forming, pouring and finishing flat work like this. Those are fair things to ask any bidder about.

How long does a new concrete floor have to dry before flooring goes down?

There's no set wait, because industry guidance says the slab should dry out after proper curing and then be tested for moisture before any flooring goes on. A vapor retarder slows moisture from the ground, but the water already in new concrete still has to work its way out. That matters because vapor rising through a slab can make adhesives fail, so carpet, tile, wood or vinyl can lift, warp or stain and turn into a trip hazard.

What causes a new concrete floor to have high spots or a worn surface?

Usually it's the timing of the finishing, because finishing, cutting joints and curing each have a window, and missing it can leave cracks, a surface that wears fast, and high or low spots. That's why our crew is set up before the truck arrives, and why I'd rather move a pour than rush it on a hot afternoon.

Plan your Lincoln concrete floor with us

We answer until 11 PM every day, so you can call (916) 884-6595 after work or send the form tonight.

(916) 884-6595
(916) 884-6595Request an estimate