Cracked, sinking or puddled parking areas? We plan the base, the drainage and the truck lanes first, so your new lot holds up to daily traffic.
Request an estimate
What goes into building a concrete parking lot in Lincoln?
Concrete parking lot building in Lincoln, CA means grading and packing the ground, then forming and pouring a slab laid out for how your lot actually gets used, from customer cars to delivery trucks, so it can give good service for many years with little upkeep.
Most owners call us because an old asphalt or gravel lot keeps cracking, sinking or holding puddles, or because a new building needs parking before it can open. The price moves with the lot's size, the ground under it and the traffic it has to carry, and the schedule usually turns more on plan review and permits than on the pour itself. If old pavement has to come out first, concrete cutting is often where the job starts. I walk the site with you, explain what I see and put the whole estimate in writing, so you have real numbers to compare.
How our crew builds a concrete parking lot
I start every lot the way I used to start a dinner service, with the plan, because once the concrete truck shows up there's no starting over. We map where heavy trucks and dumpster pickups will drive and stop, so those lanes and pads get a thicker slab and more steel from the beginning instead of patches later. Then we dig down to firm subgrade, the native soil the slab sits on, and pack a rock base in layers rather than raking the dirt level, because a base that isn't compacted settles and takes the slab down with it. We check where the rain will run so water heads to the drains and away from the building, set the forms and place rebar, steel bars that hold the slab together if it cracks. We pour early in the day to stay out of the midday heat that leaves a weak, dusty top, give it a broom finish, a light ridged texture so tires and shoes grip when it's wet, and cut control joints, shallow grooves that give the concrete a straight place to crack, before it cracks somewhere nobody chose. If the budget gets tight, I'd rather spend it on the base than on a fancy surface, because the base is the one part you can't fix later.
Lots often need work around the edges too. Light poles, sign posts and dumpster enclosure walls each sit on concrete footings that we can pour while the crew is already on site. If the building next to the lot has settled, foundation raising is worth looking at before we set the new grade, so the lot meets the doorways at the right height.
What shapes concrete parking lot building in Lincoln
Drainage paperwork is often the long pole on a Lincoln lot, because a parking lot is a big hard surface that sends rain somewhere. When a project has to include stormwater and trash controls, the City of Lincoln wants a final stormwater quality plan in place before it issues the building permit, and a preliminary plan goes in earlier with the project's application. Whether your lot falls under that rule depends on the project, so before we start we check with the city office that covers your address, and when a permit is needed we take care of the paperwork and inspections with you. You can see how the steps line up on the city's stormwater program page.
The ground is the other thing to plan around. Across the low-lying western part of Placer County, from Rocklin out to the county line, much of the soil has moderate to high shrink-swell, clay that swells when it's wet and shrinks as it dries, so on those sites I dig deeper, build a thicker packed base and grade water well away from the slab. We see the same ground on jobs in Rocklin and Roseville. Frost isn't a design worry here, since the city lists no frost line among its design criteria.
Parking lots and site paving
Get a written estimate for your concrete parking lot
We reply within one business day to set a time, then I walk your site with you, explain what I see and put the estimate in writing. The estimate is free, done on site and comes with no obligation.
(916) 884-6595Parking lot questions from Lincoln owners
How much does a concrete parking lot cost in Lincoln, CA?
A concrete parking lot is priced on your site, not a set rate, so the number comes after someone walks it. The biggest swings come from how much soft soil has to come out and be replaced with packed base, how many lanes need a heavier slab for trucks, whether old pavement has to be cut out and hauled off, and what stormwater work the city asks for. Putting heavy concrete only where trucks drive keeps the cost down, and pervious concrete can trade some pond and pipe work for ongoing cleaning.
Is pervious concrete a good choice for a parking lot?
Pervious concrete can be a good fit for parking stalls and other light-traffic paving, because rain soaks through it instead of running off. Cutting that runoff can shrink, and sometimes remove, the need for a separate stormwater pond and can allow smaller storm sewers. The trade-off is upkeep, since debris clogs its open spaces and it needs scheduled vacuum sweeping and pressure washing, so plan that cleaning into running the lot.
How long does plan review take for a parking lot in Lincoln?
Some Lincoln projects need a plan check, a city review of the project plans, that can take 2 to 6 weeks depending on the size and complexity of the job. Build that time into the date you want the lot open, because when a permit is needed we can't start work until it's issued.
What does a contractor need to work in Lincoln, CA?
The City of Lincoln requires a contractor to hold a current city business license, carry workers' compensation and be bonded, and every subcontractor on the job needs a city business license and a bond too. Ask each company you're comparing to show you those before you sign, along with its state license.
How do I plan a concrete parking lot for delivery trucks and dumpsters?
Start by working out which drives and stops will carry heavy trucks, because most lots have some driveways that take real weight and knowing that early lets those areas be planned from the start. Dumpster access can need its own attention in the design, since the truck that empties it is heavy and stops in the same spot every time. Bring your best guess at truck and pickup traffic to the walk-through and we'll mark those areas on the layout.
Do I need to call 811 before building a parking lot in Lincoln?
Yes, the City of Lincoln directs anyone digging to contact Underground Service Alert first by calling 811 or 800-642-2444, so buried lines get marked. We make that call before our crew digs.