One Call Lincoln Concrete

Foundation installation in Lincoln CA - built to suit your lot and your soil

Planning a new home, addition or replacement and unsure what it should sit on? We match the foundation to your lot, then plan for inspection.

Request an estimate
A smooth concrete walkway and broad steps lead to a brick home's entrance, with flowering shrubs along both sides.

What goes into a new foundation in Lincoln?

Foundation installation in Lincoln is the forming, pouring and finishing of the concrete your house stands on, so a new home, an addition or a replacement starts on solid, level ground with the footings and steel the city will check.

Most people who call me have plans or an idea, a piece of ground, and real questions about what should go under it. The price moves with the foundation type, the size of the footprint, how much the lot slopes and how much digging and steel the design needs. The schedule turns mostly on the city's review and inspections, and on giving the concrete time to cure, which means letting it harden and gain strength before anything heavy goes on it. I'll walk the lot with you and put your own figure in writing, and if you already know you want a slab, our slab foundation building page goes deeper on that.

How our foundation installation works

I start with your lot and your project, whether it's a new home, an addition or a replacement, and we talk through whether a slab or a raised foundation fits better, because the ground decides more than the drawings do. Then we plan the trenches, forms and steel around the inspection for your address. Our crew digs the footing trenches down to firm, clean ground, sets the forms and ties in the rebar, the steel inside the concrete that holds it together when the ground or an earthquake tries to pull it apart. We pour early in the day, because concrete that cooks in the afternoon heat can end up with a weak, dusty top, and then we finish it and let it cure. When budgets get tight, the first thing people want to trim is the digging and the steel, since nobody sees it once the walls go up. I won't cut there. It's like prep in a kitchen, because once the truck shows up there's no starting over.

Plenty of foundation jobs come with concrete footings for a porch, a garage or a wall that needs its own support, and it makes sense to plan them at the same time. Property owners putting up a bigger building often need concrete parking lot building too, and laying out the grades for both together keeps water running away from the new foundation instead of toward it.

  • Slab on grade for level lots

    A slab is one pour that sits right on the prepared ground, with thicker edges where the walls bear down, and it suits a fairly flat lot. It's the most common choice we see for new homes and additions.

  • Post-tensioned slab for shifting soil

    The Post-Tensioning Institute, a trade group, says in its general guidance that post-tensioned slabs, which have steel cables tightened after the pour, are a cost-efficient answer for homes on soil that shrinks and swells, because that built-in squeeze resists the stress the moving ground puts on them. If your lot has that kind of ground, it's worth asking whether one fits.

  • Raised or pier and beam foundation

    This puts the floor up on piers or short walls over a crawl space, so it suits a sloped lot or a house where you want room to get underneath. We pour the footings and piers, and the framer builds the floor on top.

  • New footing for homes on posts

    The California Residential Mitigation Program says a home built on wooden posts or concrete piers needs a new, continuous concrete footing. A contractor can install it from pre-engineered plans, or an engineer can design a different system, so you're choosing between a ready plan and a custom one.

Foundation installation in Lincoln: permits, licenses and ground

The City of Lincoln requires a building permit any time a structure is built, enlarged, altered, repaired, moved or demolished, so plan on one for new foundation work. Before we start, we check with the city or county office that covers your address, and when a permit is needed we take care of the paperwork and inspections with you. The city also says any contractor working there needs a current City of Lincoln business license, current workers' compensation and a bond, and every subcontractor needs the license and the bond too. Ask anyone you're comparing to show you those before you sign.

The city posts its design values as Seismic Design Category D, with no frost line or snow load. In plain terms, there's no frozen ground to dig below here, so earthquake design does more to shape the steel and hardware than winter does, and you can ask any contractor how their plan accounts for that. The bigger difference job to job is the lot itself, since flatter ground like much of what we see in Roseville usually suits a slab, while lots get steeper toward Auburn, where a raised foundation comes up more often.

Get a written foundation estimate for your lot

We reply within one business day to set a time, then I come out, walk the lot with you, explain what I see and put the estimate in writing. It's free and done on site, and there's no obligation.

(916) 884-6595

Lincoln foundation questions we hear

How much does foundation installation cost in Lincoln, CA?

I can't give a fair number until I've seen the lot, because foundations vary more than almost any other concrete job. Things that raise the price include a raised foundation's separate piers, a sloped lot that needs more digging and forming, an engineered design instead of a ready plan, and extra steel for earthquake hardware. A flat, open lot the concrete truck can reach and a simple, square footprint keep it down.

Is a slab or pier and beam foundation better for my lot?

A slab usually fits a fairly flat lot and a tighter budget, and pier and beam usually fits an uneven lot or a house where you want easy access underneath. One foundation contractor's guide says slabs cost less upfront and resist pests, while pier and beam handles uneven ground better and lets a plumber reach pipes from the crawl space without touching the floor. With a slab, a cracked or corroded pipe underneath means jackhammering through the concrete to get to it, so I'll tell you which way I lean once I've walked your lot.

How long does the city's plan check take for a foundation in Lincoln?

The city says projects that need a plan check can take 2 to 6 weeks, depending on size and complexity. That review happens before anyone digs, so we build it into your start date instead of guessing at one.

Who do I call before digging footing trenches in Lincoln?

Call Underground Service Alert at 811 or 800-642-2444 before any digging starts, which is what the city tells everyone to do. On our jobs we make sure that call is done before the first trench goes in, so nobody hits a buried line.

How do I get ready for a footing inspection in Lincoln?

For the city's footing and foundation inspection, the trenches should be dug out and clean, with the forms, reinforcing steel and seismic hardware already in place. That's why we plan all of it around the inspection from the start, and you can ask us any time when it'll be ready for the inspector.

What causes cracks in a new concrete foundation?

Most cracks come from ground that moves or settles under the concrete, or from concrete drying and shrinking without enough steel to hold it together. Fine hairline cracks from drying are common and usually just cosmetic, while wide or growing ones point back to the ground. That's why I put the time into the trenches, the steel and the pour timing, and why I'd rather take a closer look at a tricky spot than guess.

Start planning your Lincoln foundation now

Call (916) 884-6595 or use the form with your address, the kind of project and what's there now, so I know what to look for before I come out.

(916) 884-6595
(916) 884-6595Request an estimate